ST HELIER, Jersey, June 03, 2024 (GLOBE NEWSWIRE) — Caledonia Mining Corporation Plc (“Caledonia” or the “Company”) (NYSE AMERICAN: CMCL; AIM: CMCL; VFEX: CMCL) is pleased to announce that the Company will shortly be filing a preliminary economic assessment in accordance with Canada’s National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) on SEDAR+ (the “PEA”) for a single-phase development of the Bilboes sulphide gold project (the “Project”). A copy of the PEA, which is entitled “Bilboes Gold Project Preliminary Economic Assessment” with effective date May 30, 2024 prepared by DRA Projects (Pty) Ltd (“DRA”), and reflecting the summary information contained in this announcement, will also be available on the Company’s website at www.caledoniamining.com/investors/technical-reports/. All dollar figures are in U.S. dollars unless otherwise noted.
The PEA reflects the work that has been done by Caledonia and its consultants over the period since the Project was acquired by Caledonia in January 2023. This work focussed on updating the feasibility study in respect of the Project that was prepared by DRA on behalf of the previous owners of the project and which had an effective date of December 15, 2021 (the “Former Feasibility Study”); the